PTE · Describe Image

Urban Street Tree Management: PTE Describe Image practice questions

4 original Describe Image questions. Question 1 is free to record, play back and compare with a sample answer right here; log in free to practise the rest in the BandLadder app.
  • 4 questions
  • Question 1 free, no login
  • PTE Academic and PTE Core
1

Sapling Survival Rates by Method

Free to try, no login

Look at the image below. You have 25 seconds to study it, then 40 seconds to describe in detail what it shows.

Five-Year Sapling Survival Rates by Planting System (%). Survival Rate: Compacted Pit 28, Structural Soil 62, Suspended Pavement 88, Engineered Trench 74.

Five-Year Sapling Survival Rates by Planting System (%)
020406080100Compacted PitStructural SoilSuspended PavementEngineered Trench
View the data
Compacted PitStructural SoilSuspended PavementEngineered Trench
Survival Rate28628874

Your recording stays in this browser: it is not uploaded or stored.

Questions 2–4

Look at the image below. You have 25 seconds to study it, then 40 seconds to describe in detail what it shows.

Read them here; log in to answer and check them.

2

Urban Tree Establishment Cycle

Stages of Street Tree Establishment. Stage 1: Nursery root pruning. Stage 2: Transport and site excavation. Stage 3: Root flare alignment. Stage 4: Aerated backfilling and staking. Stage 5: Three-year hydration monitoring. Stage 6: Canopy formative pruning.

Stages of Street Tree Establishment
  1. 1.Nursery root pruning
  2. 2.Transport and site excavation
  3. 3.Root flare alignment
  4. 4.Aerated backfilling and staking
  5. 5.Three-year hydration monitoring
  6. 6.Canopy formative pruning
3

Causes of Premature Tree Mortality

Primary Causes of Street Tree Mortality (%). Soil Compaction 38, De-icing Salt Toxicity 24, Vandalism and Impact 18, Drought Stress 12, Pest Infestation 8.

Primary Causes of Street Tree Mortality (%)
  • Soil Compaction: 38%
  • De-icing Salt Toxicity: 24%
  • Vandalism and Impact: 18%
  • Drought Stress: 12%
  • Pest Infestation: 8%
View the data
CategoryValue (%)
Soil Compaction38
De-icing Salt Toxicity24
Vandalism and Impact18
Drought Stress12
Pest Infestation8
4

Avenue Tree Layout and Clearances

Standard Urban Boulevard Planting Scheme, north at the top. North Pedestrian Footpath in the north, North Bioswale and Tree Lawn in the north, Active Traffic Carriageway in the centre, South Bioswale and Tree Lawn in the south, South Pedestrian Footpath in the south.

Standard Urban Boulevard Planting Scheme
North Pedestrian FootpathNorth Bioswale and Tree LawnActive Traffic CarriagewaySouth Bioswale and Tree LawnSouth Pedestrian FootpathN

Want to answer the other 3?

Log in to practise Describe Image in the BandLadder app: the full question bank, with an AI score from BandLadder AI for content, pronunciation and oral fluency on a free account.

Ready for the whole test?

Take a full PTE mock with every question type, the real timings and a score on Pearson's 10–90 scale the moment you finish.

Try a free PTE mock →

Keep practising

More Describe Image sets

Practise every PTE question type

  • ✓Full question bank for every type
  • ✓Instant scoring, marked the way Pearson does
  • ✓BandLadder AI scoring for speaking and writing
Practise in the app

Free account · no card

© 2026 BandLadder. Written and checked by the BandLadder team. You may quote or cite this page with credit to BandLadder and a link to it; republishing it in full needs our written permission. Content use policy

Log in to practise all 4